SUTT Kediri – Kertosono Transmission
Client: PLN (Persero)
The Challenge
Increasing regional load required expanded transmission capacity, busbar extensions and additional substation bays with modern protection and SCADA.
Our Solution
We constructed the transmission network, executed busbar extensions, added GI bays and installed protection systems fully integrated with SCADA.
The Result
Network capacity and reliability increased significantly, supporting industrial and residential growth across the Kediri–Kertosono corridor.
+35%
Capacity increase
Multi-bay
GI expansion
